Event schedules / International Maintenance Conference 2026 / Speakers
John Ganaway

John Ganaway

Maintenance & Reliability Specialist, Jacobs Engineering

linkedin

John is an experienced Asset Management subject matter expert with more than 25 years of experience in multiple industries including serving in the United States Navy Submarine Nuclear Power Program. He focuses on Maintenance & Reliability excellence, leading high-performance work teams and systems to excellence, demonstrating world-class results by building a culture of inspiration, motivation, and collaboration. He has supported organizations by developing their Design for Reliability (DfR) programs and toolkits to provide value by significantly reducing the overall Total Cost of Ownership (TCO). He specializes in Predictive Technologies and is trained in vibration analysis, thermography, and acoustic emission (UE). John has significant PdM/CBM program development, integration, execution, audit, and continuous improvement experience. He supported one of the world’s largest pharmaceutical plants as its reliability engineer, executing Reliability Centered Maintenance (RCM), Root Cause Analysis (RCA), and Failure Analysis. He is a successful change agent that implements improvements through asset, system, and process knowledge. By developing deep relationships, John has leveraged his experience to build floor-level improvements from system-level conceptual ideas. His ability to build programs, processes, and strategies to influence the culture of a facility is what differentiates his approach and results. He developed, managed, and provided continuous improvement of Condition Based Maintenance Programs and Reliability Centered Maintenance Programs at the Genentech Vacaville Site. John works closely with site and network leadership and operations to implement a framework for reliability, develop standardized practices, ensure compliance, and improve asset availability. He has developed and delivered training associated with maintenance and reliability best practices, M&R BP awareness, and was the CCP1 Liaison between reliability, operations, and engineering to ensure reliability is "built-in" engineering projects and the total cost of ownership is a focal point.

Sessions

Monday, December 7, 2026

  1. – Is Your Project Operationally Ready?
    Level 3: Calusa 4 · Reliability Engineering for Maintenance · John Ganaway, Patrick Haedtler