Event schedules / International Maintenance Conference 2026

Asset Lifecycle Extensions Beyond Capital Replacement Projections Using Uptime Elements®

Monday, December 7, 2026, – (America/New_York)
Level 3: Calusa 4 · Asset Management

Capital replacement projections are a major influence on asset lifecycle management strategy and often use age-related benchmarks or superficial condition assessments to determine if an asset is ready for renewal. Yet how we maintain our assets directly impact their operational costs and will affect how soon that asset will need to be replaced or retrofitted through a capital budget.

The Uptime Elements provides a framework to better manage our assets and extend the asset lifecycle, instead of relying on conventional age-related or oversimplified conditional assessments to benchmark lifecycle projections.

Join Erik Enderling Facility Director for Mercy Hospital St Louis, Mercy’s flagship hospital, and Ben Carrel General Manager with Forum Reliability as they discuss Mercy Hospital’s St. Louis strategy to extend asset life beyond capital replacement projections by right sizing their PM program, deploying condition monitoring technology, and changing how they measure and track asset performance and asset life.

Knowledge Level: Introductory

Speakers