Enterprise PM Optimization at Scale: Advanced Maximo Strategies for Standardization, Workload Smoothing, and Reliability Growth
Wednesday, December 9, 2026, – (America/New_York)
Lobby Level: Caxambas 2 · Reliability Engineering for Maintenance
This presentation shows how GAF optimized preventive maintenance for 100,000+ assets across the enterprise in just 12 months using advanced Maximo strategies and techniques. Preventive Maintenance strategies, job plans, and follow-up failure codes were standardized through predefined asset-class data models, validated in cross-functional kaizen events, with Safety and Quality prioritized through a system-first approach. Maximo architecture enabled local administration and control while supporting enterprise analytics and decision making. The approach expanded PM coverage and consistency at scale. Key lessons include how to sustain senior leadership commitment, proactively training to build awareness, and engaging communications to overcome resistance and ensure lasting adoption.
Knowledge Level: Intermediate
Speakers
-
Director Reliability Engineering, GAF
-
President, YZR Enterprises