Enhancing Reliability in a State-of-the-Art Medical Campus: Implementation of Classical Reliability-Centered Maintenance (RCM) at UCI Health Irvine
Tuesday, December 8, 2026, – (America/New_York)
Level 3: Calusa 4 · Reliability Engineering for Maintenance
The new UCI Health Irvine campus represents a landmark all-electric medical complex featuring a Central Utility Plant (CUP), 144-bed Acute Care Hospital, Ambulatory Care Center (ACC), and Chao Family Comprehensive Cancer Center (CAC). This presentation highlights comprehensive reliability efforts to ensure uninterrupted patient care, operational resilience, and lifecycle cost optimization across these critical infrastructure assets. A core pillar of the reliability program is the application of classical Reliability-Centered Maintenance (RCM) analysis, following the rigorous four-phase methodology derived from Nowlan and Heap principles. This structured approach system definition and function identification, functional failure analysis, failure mode and effects evaluation (including criticality), and task selection/implementation with ongoing reviews applied to the CUP, Air Handling Units (AHUs), electrical distribution infrastructure, and additional high-impact assets. By preser
Knowledge Level: Introductory
Speakers
-
CEO, Forum Reliability